Work Starts At Comrades Hall – Monday 10th January

Work begins on Monday, 10th January at the Comrades Hall to replace the central heating system. An air source heat pump system is being installed to replace the current old oil-fired system. In addition, they are installing 36 solar panels (PVs) across 3 roof surfaces.

The electricity generated will power the daytime use in the Hall, with the surplus directed to heating the water, and any remaining surplus after that sent to the National Grid. These installations will greatly reduce the carbon footprint of our village hall. This work is being funded largely thanks to grant funding awarded by The National Lottery Community Fund and Low Carbon Dorset.

Obviously there will be disruption to normal hall usage while this work is taking place, but please be assured that  Post Office services and Comrades Arms sessions will still take place as usual, and that any existing hall bookings will be able to go ahead.

Please direct any enquiries to Chairman, David Leader: 01308 868275.
Thank you.

#Broadwindsor,#Drimpton,#Burstock,#Blackdown,#Hursey,#Kittwhistle,#Seaborough,#Village,#WestDorset,#Dorset,#2022,#ComradesHall,#CarbonFootprint,#SolarPanels,#NationalLotteryCommunityfund,#LowCarbonDorset,#ERDF#ClimateChange,#WearYourMask,#BeKind,#BeSafe,#StaySafe