3 Days Roadworks & Diversion From Tuesday, 1st February

Any unauthorised Person who uses or permits the use of the road(s) indicated in contravention of the Notice will be liable on summary conviction to a fine not exceeding £1,000.

All vehicles will be prohibited from proceeding along B3162 Broadwindsor between it’s junction with Redlands Lane and B3163 – a distance of approximately 195 metres. The Order is needed in order to comply with health and safety regulations, which require the provision of safe working areas and to minimise the likelihood of danger to highway users.

It will come into operation frm 09.30hrs – 15.30hrs on Tuesday, 1st February and be in force for 5 days although it is anticipated that the work will be completed by 3rd February.

This Order will enable BT Openreach, safe access to carry out urgent works in the highway to restore customer service.

The alternative route will be signposted: B3163 – A3066 – B3162 – North Allington – Bridport Road.

If you would like further information about the work being undertaken and access arrangements, please call Sunbelt Rentals (Agents for BT Openreach) on 03700 500 792.
For more information on any Roadworks or Closures, please contact:
Dorset Highways Traffic Team01305 221020 or email: trafficteam@dorsetcouncil.gov.uk.

#Broadwindsor,#Burstock,#Blackdown,#Drimpton,#Hursey,#Kittwhistle,#Seaborough,#Community,#Village,#WestDorset,#Dorset,#BGPC,#DorsetCouncil,#Roadworks,#DorsetHighways,#BTOpenreach,#Diversion,#RoadClosed,#SunbeltRentals,#BeSafe,#DriveSafe,#StaySafe

Temporary Speed Limit on Beaminster Road – January 8th

BT’s Openreach will be performing underground works from outside Wantsley Farm on the B3163 to Horn Park Farm on Saturday, January 8th.

A 40 mph temporary speed limit will be imposed in both directions. This will be from 8am on Saturday through to 4pm on Sunday 9th January when they expect their works to be completed.  Openreach will have boards and signage in place.

#Broadwindsor,#Burstock,#Blackdown,#Hursey,#Kittwhistle,#Seaborough,#Dorset,#BWGPC,#Beaminster,#WestDorset,#DorsetCouncil,#Roadworks,#DorsetHighways,#OpenReach,#2022,#BeSafe,#DriveSafe,#StaySafe

Marshwood Road Closure – Thursday, 18th November

A temporary closure of the A3615 to allow Dorset Council to carry out carriageway maintence and resurfacing work.

From 9am – 4pm, the A3165 will be closed from the junction at Birdsmoorgate (A3614) down to Racedown farm – in both directions.
Although in force for five days, it is anticipated that the work will be completed by 19th November.

For more information on any Roadworks or Closures, please contact:
Dorset Highways Traffic Team01305 221020 or email: trafficteam@dorsetcouncil.gov.uk.

#Broadwindsor,#Burstock,#Blackdown,#Drimpton,#Hursey,#Kittwhistle,#Seaborough,#Village,#AONB,#Dorset,#WestDorset,#DorsetCouncil,#Roadworks,#DorsetHighways,#Diversion,#RoadClosed,#2021,#BeKind,#BeSafe,#DriveSafe,#StaySafe

 

North Allington Roadworks Ends Early

Anticipated to be completed by 12th March, Wessex Water have completed their roadworks at the top of the Salway Ash Road to Bridport and traffic can now flow through 🙂

It has been almost a month since works began and this will be very welcome news for many, particularly ahead of more children returning to schools and colleges on Monday 8th March.

Well done Wessex Water.

#Broadwindsor,#Burstock,#Blackdown,#Hursey,#Kittwhistle,#Seaborough,#Dorset,#BWGPC,#Bridport#WestDorset,#Drimpton,#DorsetCouncil,#RoadworksEnd,#DorsetHighways,#WessexWater,#Diversion,#NationalLockdown,#2021,#BeSafe,#DriveSafe,#StaySafe

Ongoing Roadworks At North Allington From 8th February

Temporary Road Closure – Friday 22nd January

From 9.30am on Friday 22nd January, all vehicles will be prohibited along the B3164 between Kingswood Park and Greengate for a distance  of 300 metres.

The alternative route will be signposted: B3164 – A3066 – B3163

This is to enable BT safe access to overhead network cabling for new customer connection.

Although in force for five days, it is anticipated that the work will be completed by 22nd January.

Any unauthorised Person who uses or permits the use of the road(s) indicated in contravention of the Notice will be liable on summary conviction to a fine not exceeding £1,000.

For more information on any Roadworks or Closures, please contact:
Dorset Highways Traffic Team01305 221020 or email: trafficteam@dorsetcouncil.gov.uk.
For more information on the Work being undertaken, please contact:
BT01234 773833

#Broadwindsor,#WestDorset,#DorsetCouncil,#Roadworks,#DorsetHighways,#BT,#Diversion,#RoadClosed,#NationalLockdown,#2021,#BeSafe,#DriveSafe,#StaySafe

Urgent Temporary Closure of Potwell Farm Road, Mosterton

On Monday 21st December at 9.30am until 3.30pm, all vehicles will be prohibited from proceeding along Potwell Farm Road, Mosterton between Littlewindsor Farm junction and the entrance to Potwell Farm.
This is to enable BT safe access to overhead network cable renewal to restore customers out of service.
The alternative route will be signposted – Mosterton Cross – A3066 – B3164 – Littlewindsor Farm Junction.

Although in force for five days, it is anticipated that the work will be completed by the 21st December.

Any unauthorised Person who uses or permits the use of the road(s) indicated in contravention of the Notice will be liable on summary conviction to a fine not exceeding £1,000.

For more information on any Roadworks or Closures, please contact:
Dorset Highways Traffic Team01305 221020 or email: trafficteam@dorsetcouncil.gov.uk.
For more information on the Work being undertaken, please contact:
BT01234 773833

#Broadwindsor,#WestDorset,#DorsetCouncil,#Roadworks,#DorsetHighways,#BT,#Diversion,#PotwellFarm,#RoadClosed,#Littlewindsor,#SocialDistancing,#BeSafe,#DriveSafe,#StaySafe

Councillor Simon Christopher’s Report – Dec 2020

Here is our local Councillor Simon Christopher’s interim report submitted to the Parish Council’s meeting this evening.

“I am actually writing exactly seven days before the meeting and as a politician famously said, a week is a long time in politics.

I thought I would set out some thoughts at the last meeting of the year. A difficult year in which we have seen so many people rally around to help vulnerable people.

The council has risen to the task of helping the elderly, the infirm and has acted positively to help with the provision of meals to vulnerable children over holiday times.  There has of course been financial consequences and the council has had to utilise reserves.

Councillors Jill Haynes and Councillor Tony Ferrari as portfolio holders have written to all Town and Parish Council clerks re the Dorset Council area.  The communication is in respect of the Dorset Council Asset review Process, which was presented to Cabinet on 3rd November 2020.
Extracts include ‘There are a number of (property) holdings which we need to consider in order to rationalize the estate and reduce cash’

‘The desire is to

  1. Create economic growth by creating new homes and jobs
  2. Delivering a more integrated customer focused service, through joint provision with partner organisations
  3. Generate efficiencies through capital receipts and running costs’.

Please contact me if you have not seen the aforementioned email or wish to discuss the matter. 

Councillors are currently discussing the budget setting process, primarily:

  • Children’s Directorate
  • Place Directorate- including property’s, highways and Dorset Waste
  • Adults Directorate
  • Corporate Directorate

There is to be a concentrated effort to achieve savings in contract arrangement without a reduction in service.

The Parish Council will be aware of the considerable correspondence involving Highways and the police about continuing damage to the verges etc at Common water Lane.  This is an ongoing matter and many of us are determined  that the above authorities are made aware of the continuing concern of residents.

I will be pleased to receive your thoughts on possible changes to Dorset Council car parking charges. 

You may have noticed that Dorset Council car parks will be free on Saturday’s in December 2020. (In Sherborne I understand this will be on Mondays)

The mailbag of a Dorset Councillor in a rural ward appears to show continued concern about speeding motorists and I pass on these concerns to the relevant highways officers and other agencies.

Thank you to those Parish Councillors who contact me re concerns about footpaths and I have contacted the officer on   your behalf.  I continue to request a pavement be installed from Broadwindsor Village to the cricket ground.

I am in touch with officers to make sure drains in Seaborough are properly cleared,  as a result of residents concerns.

Rachel Baker, senior communications officer Digital and Change Dorset Council has been publicising the Gigabit Voucher Scheme.  An email has come out to John and myself, which has been further circulated and you have comments on this.

On 30th November 2020 the Government has unveiled its Path to Sustainable Farming.

The reason I draw your attention to this is :

  1. The mere fact that even in the heart of your village you are but yards away from a field managed by members of the farming community.
  2. This will impact on the County Farms Estate of some 46 farms and all our local farmers.

The Government states that it plans to deliver a better fairer farming system in England with the objective of changing the way the Government supports farmers.  The roadmap has outlined changes that will come in over a seven year period.

‘The changes will be designed to ensure that by 2028 farmers in England can sustainably produce healthy food profitably without subsidy, whilst taking steps to improve the environment, improve animal health and welfare and reduce carbon emissions.

Next year marks the start of the transition where we will begin to move away from the Basic Payment Scheme(BPS) towards new policies that will be co-designed and tested together with farmers, land managers and experts, to ensure that the new systems work for them.

The ‘Path to Sustainable Farming’ document  sets out more detail on the changes we are going to make, and what they will mean to farmers.

The key changes include:

  • Introducing the Environmental Land Management scheme to incentivise sustainable practices, create habitats for nature recovery and establish new woodland to help tackle climate change.
  • Investing in improving animal health and welfare as part of our sustainable farming approach. This will initially focus on controlling or eradicating endemic diseases amongst cattle, pigs and sheep.
  • Direct payments will be reduced fairly, starting from the 2021 Basic Payment Scheme year, with the money released being used to fund new grants and schemes to boost farmer’s productivity and reward environmental improvements.
  • Launching a Farming Investment Fund, which will support innovation and productivity. This will open for applications next year and will be used to offer grants for equipment, technology and infrastructure for the future.
  • Simplifying and improving existing schemes and their application processes further from January 2021 to reduce the burden on farmers, and we will take a modern approach to regulation, cutting unnecessary red tape for farmers and working together with industry to design a more targeted regulatory system.

In a nutshell, the bulk of future payments will be through the new Environmental Land Management Scheme (ELMS), but it will not be fully available to farmers for four years.  Meanwhile, cuts to the old scheme will begin in January 2021.  By the time  the ELM Scheme is fully available, farming businesses face losing 50% of the financial support they previously received.  The reliance on BPS for farming businesses of all sizes is it seems, such that farmers may struggle.

The Dorset Local Plan

Many of you will have noticed that there will be consultations in respect of The Dorset Local Plan.  The timetable will approximate to:

1st December 2020 –  Details published on the Dorset Council website for discussion at Dorset Council Cabinet

8th December 2020 – Discussion at Dorset Council Cabinet

Mid January 2021 – Consultation period opens for a period expected to be for 8 weeks.

In the event the Cabinet agenda was published yesterday evening and I will be pleased to discuss initial thoughts with you at the meeting this evening.

To quote the documentation:

Having an up to date local place is critical in order to shape the future of the Dorset Council area, providing for development to meet the areas needs and manage decisions of planning applications.  Public consultation is a vital part of the process and this consultation will enable a wide range of views to be taken into account in moving the plans forward.  The plan includes potential development sites in order to meet the needs for housing, employment and other uses over the period to 2038

It is proposed that the public consultation takes place for eight weeks starting in mid January 2021. The ongoing coronavirus pandemic means that face to face consultations are unlikely to be possible but in addition to the document and supporting evidence being available online a range of consultation methods are proposed including  online events, social media and copies available to loan in libraries.

After consultation a final draft plan will be published with an opportunity for further feedback and comments before being submitted for examination. At that stage responses will be considered and assessed by the independent inspector who examines the plan.

The intention is to adopt the plan by April 2023 .

Dorset Council has published the Dorset Highways Winter Service Policy and Operational Plan 2020/21.  This document has been made available to all Parish Council clerks.

I wish you all a safe very enjoyable Christmas and New Year.

Best regards

Councillor Simon Christopher
Dorset Councillor for The Marshwood Vale Ward

https://www.simonchristopher.info/

#Broadwindsor,#Dorset,#BWGPC,#BGPCLT,#SocialDistancing,#Community,#DorsetPolice,#Farmers,#DorsetHighways,#DorsetLocalPlan,#Burstock,#Blackdown,#Hursey,#Kittwhistle,#Seaborough,#Drimpton,#BroadwindsorCC,#ParishCouncil,#Coronavirus,#Christmas,#Zoom,#ComradesHall,#VillageHall,#Tier2,#StaySafe